Prefabricated construction has redefined project scheduling by implementing concurrent processes that differ fundamentally from traditional on-site methods. Rather than following a linear sequence, building modules are assembled in climate-regulated plants at the same time as groundwork proceeds. The dual-track strategy substantially reduces the construction duration. Unpredictable environmental conditions that frequently stall site work have minimal effect because the majority of work is completed indoors. Therefore projects are often exceed their scheduled completion dates. Both builders and property owners gain enhanced scheduling predictability because assembly lines operate with consistent rhythm and ال اس اف avoid common delays. Inventory management and material deliveries become more precise, resulting in fewer site stoppages. Moreover because components are built with precision engineering, there is minimal need for rework once modules arrive on location. These optimized processes lead to accelerated timelines, enabling quicker mobilization for subsequent projects. Ultimately, modular construction offers a structured approach to scheduling control, driving timely completions.

댓글목록

등록된 댓글이 없습니다.

충청북도 청주시 청원구 주중동 910 (주)애드파인더 하모니팩토리팀 301, 총괄감리팀 302, 전략기획팀 303
사업자등록번호 669-88-00845    이메일 adfinderbiz@gmail.com   통신판매업신고 제 2017-충북청주-1344호
대표 이상민    개인정보관리책임자 이경율
COPYRIGHTⒸ 2018 ADFINDER with HARMONYGROUP ALL RIGHTS RESERVED.

상단으로